MAY 24th & 25th 2021 WE HAD SOME EARTH WORK DONE  AROUND THE RANGE. 

WORKERS FROM JOHN HELLMAN CONSTRUCTION, BESSEMER, GRADED THE ROAD IN (no photos, sorry) AND PLACED A CULVERT ON THE LEFT SIDE OF THE PISTOL BERM, DUG OUT A DRAINAGE POND BEHIND THE PISTOL BERM AND FILLED IN THE LOW SPOT TO THE NORTH AND IN THE CENTER OF BOTH PAVILIONS. THIS SHOULD ADDRESS VARIOUS DRAINAGE ISSUES WE HAVE HAD.

WE THANK THE HELLMAN CREW FOR THEIR WORK.

IMG_2374
press to zoom
IMG_2375
press to zoom
IMG_2377
press to zoom
IMG_2383
press to zoom
IMG_2384
press to zoom
IMG_2385
press to zoom
IMG_2386
press to zoom
IMG_2396
press to zoom
IMG_2393
press to zoom
IMG_2394
press to zoom
IMG_2387
press to zoom
IMG_2389
press to zoom
IMG_2390
press to zoom
IMG_2392
press to zoom
1/1

BELOW ARE SOME PHOTOS FROM OUR HUMBLE BEGINNINGS.

THESE SHOW THE CONSTRUCTION OF OUR EDUCATION CENTER.

001start
001start

our humble beginnings

press to zoom
002slabprep
002slabprep

prepping for the slab

press to zoom
003styro_on
003styro_on

styrofoam down

press to zoom
004cement_truck
004cement_truck

cement truck arrives

press to zoom
005floating_out_the_bubbles
005floating_out_the_bubbles

floating the cement

press to zoom
006workin_hand_in_hand
006workin_hand_in_hand

working hand-in-hand

press to zoom
007slab_almost_done
007slab_almost_done

slab is almost done

press to zoom
008firstcourseofblock
008firstcourseofblock

first course of block

press to zoom
009walls_goin_up1
009walls_goin_up1

walls are going up

press to zoom
010walls_partial_sheeted
010walls_partial_sheeted

wall are partially sheeted

press to zoom
011walls_partial_sheeted2
011walls_partial_sheeted2

wall are partially sheeted

press to zoom
012trusses1
012trusses1

starting to put up trusses

press to zoom

AFTER WE FINISHED CONSTRUCTION WE ENDED UP WITH A BEAUTIFUL BUILDING .

HERE ARE SOME INSIDE PHOTOS OF IT. 

WE ARE PROUD OF IT.

inside001
inside001

Looking east

press to zoom
inside002
inside002

Looking N.E. (-ish)

press to zoom
inside003
inside003

Looking S.E.

press to zoom
inside004
inside004

Looking S.E. (-ish)

press to zoom
inside005
inside005

Looking S.W.

press to zoom
inside006
inside006

To west again

press to zoom
inside007
inside007

Patio doors to deck

press to zoom
inside008
inside008

Looking west

press to zoom
inside009
inside009

Restroom doors

press to zoom
inside010
inside010

conference table & TV

press to zoom
kitchen
kitchen

Kitchen area

press to zoom

HERE ARE OUR PAVILIONS COVERING THE SHOOTING LINE FOR PISTOLS AND RIFLES.

THEY ARE OUR LATEST CONSTRUCTION UPDATE AND THEY ALLOW USE

IN ALMOST ALL TYPES OF WEATHER.

both
both

Both looking north

press to zoom
pav001
pav001

Both looking west

press to zoom
pav002
pav002

Pistol side looking north

press to zoom
pav003
pav003

Between the 2 to the north

press to zoom
pav004
pav004

Rifle side to the north

press to zoom
pav005
pav005

Rifle range sign

press to zoom
pav006
pav006

Pistol range sign

press to zoom
pav007
pav007

From center to east

press to zoom
pav008
pav008

From center to west

press to zoom
pav009
pav009

Rifle side to south

press to zoom
pav010
pav010

Pistol side to south

press to zoom
signs01
signs01

Safety signs

press to zoom

Obviously we cannot show all the photos we have shared on this one page alone, so here are some links to Flickr Albums where we have moved photos we have taken through the years.